BCA Outdoor Rink Taking Shape!!

Residents walking through Briarwood park in the next few days will notice that we now have the boards installed for our new outdoor rink directly behind the Briarwood Community Centre on the ball diamond. This is a low board rink that will be removed in spring. In the coming weeks, we will be installing the liner and then flooding the skating surface. Please ensure that the boards are not tampered with and the surface is not used for skating until we announce that it is available for use!! Due to the uneven ground, the flooding will be done in stages and until we have sufficient ice depth over the entire surface there is a risk of damage to the liner. Thank you for your cooperation and we look forward to having this new venue available to the residents of Briarwood as soon as possible. We are still looking for volunteer help with the final setup in the next 2 – 3 weeks so please contact us at briarwoodca@gmail.com if you can assist. Thank you.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s